WELCOME TO THE NEXT ERA OF ENGINEERING Engineering, Procurement, and Construction (EPC) Powering the Future with End-to-End EPC Solutions – From Concept to Commissioning, We Deliver Excellence. EXPLORE BRANDS DISTRIBUTOR We are Exclusive Distributor / Sales Partner of World's Top Manufacturers for Power Equipment and Tools. EXPLORE

Industrial Services

Industrial Solutions

Feature Products

Valuable Partners

Recent Projects

Citi Housing Gujranwala

10KW HYBRID SOLAR SOLUTION with Tubular Batteries backup Used 2 Inverex (Model: Nitrox 6KW-48V SP-Hybrid) 6KW Hybrid inverters are used for distributing Load of Each floor which is based on single phase and providing very Good Quality.

Read More

Tayyaba Industry Kamoke

1MW ON-GRID SOLAR SOLUTION Installed 9 inverters of 110KW capacity. They selected this model because it ranks at the top in the market, offers high efficiency, is safe to operate, highly durable, and has built-in safety features.

Read More

Champion Fans Gujranwala

100KW ON-GRID SOLAR SOLUTION Selected Huawei (Model: SUN2000-115KTL-M2) inverter it ranks at the top in the market, offers high efficiency, is safe to operate, highly durable, and has built-in safety features.

Read More

CITI HOUSING SIALKOT

15KW HYBRID SOLAR SOLUTION with Tubular Batteries backup Used Inverex (Model: Nitrox 12KW-48V 3P-Hybrid) is one of the first 3-phase hybrid inverters and is known for its high quality and reliable performance.

Read More

Al-HASHMI HOTEL Mandi Bahauddin

60KW ON-GRID AND 30KW HYBRID SOLAR SOLUTION Three hybrid inverters are used with separate battery banks for uninterrupted power supply during WAPDA load shedding.

Read More

AL-MANZOOR TEXTILE Gujranwala

126KW ON-GRID SOLAR SOLUTION Inverters Used Brand/Model: SAJ (Model: C6-125KW-T12) Needed one inverter solution for the entire system ensuring reliability and efficiency.

Read More

ACT-II Wind Power

At the ACT-II Wind Power Project, our team successfully carried out the complete testing and commissioning of a 50MW wind power station, ensuring its seamless integration with the national grid and long-term operational reliability.

Read More

Lalpir Power Generation

At Lalpir Power Generation, we delivered a comprehensive range of electrical testing and commissioning services, focusing on critical components across both the high-voltage transmission interface and internal generation systems.

Read More

UCH-II Power Station

At the UCH-II Power Station, we successfully conducted high-voltage diagnostic testing and commissioning of Capacitive Voltage Transformers (CVTs), crucial for the reliable operation and metering accuracy of high-voltage substations.

Read More

Karot Hydropower Project

At the Karot Hydropower Project, a flagship 720MW initiative located on the Jhelum River, our team was entrusted with high-voltage testing and commissioning support for 500kV shunt reactors—an essential component of the power evacuation system.

Read More

Scatec Solar Sukkhar

At the Scatec Solar 150MW project site in Sukkur, our team executed the complete testing and commissioning of three interconnected solar grid stations forming a key part of one of Pakistan’s largest renewable energy initiatives.

Read More

132KV Daulat Nagar Gujrat

132kV Daulat Nagar Grid Station in Gujrat, Ayk performed comprehensive electrical diagnostics and commissioning procedures for power transformers, current transformers (CTs), voltage transformers (VTs), and power cables.

Read More

Mangla Power Station

The Mangla Power Station is one of Pakistan’s most strategic hydroelectric installations, and our company undertook a comprehensive testing project to assess and ensure the reliability of critical grid infrastructure.

Read More

Terbela Power Station

At Terbela Power Station, our company performed electrical testing on 220kV systems, which included the augmentation of circuit breakers, high-voltage circuit breaker testing, and comprehensive Current Transformer (CT) testing.

Read More

500KV New Lahore

500kV New Lahore Grid Station, scope of work involved high-voltage testing of various 500kV equipment, including Auto Transformers (ATR), Current Transformers (CTs), Capacitor Voltage Transformers (CVTs) and the 500kV switchyard earthing system.

Read More

Golden Fuji Gujranwala

270 KW ON-GRID SOLAR SOLUTION (Model: MAC 60KTL3-X LV) 4 Inverters required for different sections with Good Quality. It can run all the loads including heavy machinery with the support of Grid.

Read More

USMAN MEDICAL COMPLEX Lalamusa

40KW HYBRID SOLAR SOLUTION 4 hybrid inverters are used with separate battery banks to ensure uninterrupted power supply even during WAPDA load shedding.

Read More

MALL One MODEL TOWN Gujranwala

52.2KW ON-GRID SOLAR SOLUTION Solis (Model: S5-GC (60)K) Selected for its top market ranking, high efficiency, operational safety, durability, and built-in protection features.

Read More